Door-to-Door Shipping & Free Installation: Your International Delivery Playbook

From packaging and insurance to customs, on-site install, calibration, and test washes—here’s how we deliver a ready-to-wash bay anywhere.

Insights

May 2, 2025

Blog Cover Image
Blog Cover Image
Blog Cover Image

What “door-to-door” covers

  • Export packaging & crating: Built for sea/road vibration and moisture.

  • Insurance: All-risk cargo coverage to your site.

  • Customs paperwork: Commercial invoice, packing list, certificate of origin, conformity docs; local requirements handled with our forwarders.

  • Transport mode: Road, Ro-Ro, or sea—balanced for speed/cost.

  • Arrival coordination: Offloading plan, temporary staging, access control.

Your site readiness checklist

  • Foundation & drainage: Correct slope, grates, mud catcher.

  • Utilities: Water flow & pressure, three-phase power, RCD protection.

  • Chemical area: Ventilation, bunds/drip trays, MSDS binder.

  • Safety: Barriers, pedestrian paths, beacons/signage.

Free installation—what’s included

  • Mechanical assembly: Rails, frame, brushes/robotic arms, dryer.

  • Electrical/automation: Panels, sensors, interlocks, emergency stops.

  • Calibration: Spray pressure, chemical dosing, speed profiles, dry times.

  • Test washes: 5–20 vehicles across body types; fine-tuning for your water and chemistry.

  • Training: Daily operation, safety routines, basic maintenance.

Typical timeline (indicative)

  • Build & prep: 2–6 weeks (configuration-dependent)

  • Transit: 5–21 days (route-dependent)

  • Installation & testing: 2–5 days

  • Go-live: Hand-over checklist + acceptance report

After installation

  • Warranty: 6-month coverage on parts & labor for manufacturing defects.

  • Support: Dedicated line, remote assistance, priority spares.

  • Performance review: 30/90-day check to validate throughput, ticket mix, and costs.

CTA: Planning a cross-border project? Talk to our logistics team for a country-specific delivery plan.

Blog Content Image - 1
Blog Content Image - 1
Blog Content Image - 1

Like what you see? There’s more.

Get monthly inspiration, blog updates, and creative process notes — handcrafted for fellow creators.

Door-to-Door Shipping & Free Installation: Your International Delivery Playbook

From packaging and insurance to customs, on-site install, calibration, and test washes—here’s how we deliver a ready-to-wash bay anywhere.

Insights

May 2, 2025

Blog Cover Image
Blog Cover Image
Blog Cover Image

What “door-to-door” covers

  • Export packaging & crating: Built for sea/road vibration and moisture.

  • Insurance: All-risk cargo coverage to your site.

  • Customs paperwork: Commercial invoice, packing list, certificate of origin, conformity docs; local requirements handled with our forwarders.

  • Transport mode: Road, Ro-Ro, or sea—balanced for speed/cost.

  • Arrival coordination: Offloading plan, temporary staging, access control.

Your site readiness checklist

  • Foundation & drainage: Correct slope, grates, mud catcher.

  • Utilities: Water flow & pressure, three-phase power, RCD protection.

  • Chemical area: Ventilation, bunds/drip trays, MSDS binder.

  • Safety: Barriers, pedestrian paths, beacons/signage.

Free installation—what’s included

  • Mechanical assembly: Rails, frame, brushes/robotic arms, dryer.

  • Electrical/automation: Panels, sensors, interlocks, emergency stops.

  • Calibration: Spray pressure, chemical dosing, speed profiles, dry times.

  • Test washes: 5–20 vehicles across body types; fine-tuning for your water and chemistry.

  • Training: Daily operation, safety routines, basic maintenance.

Typical timeline (indicative)

  • Build & prep: 2–6 weeks (configuration-dependent)

  • Transit: 5–21 days (route-dependent)

  • Installation & testing: 2–5 days

  • Go-live: Hand-over checklist + acceptance report

After installation

  • Warranty: 6-month coverage on parts & labor for manufacturing defects.

  • Support: Dedicated line, remote assistance, priority spares.

  • Performance review: 30/90-day check to validate throughput, ticket mix, and costs.

CTA: Planning a cross-border project? Talk to our logistics team for a country-specific delivery plan.

Blog Content Image - 1
Blog Content Image - 1
Blog Content Image - 1

Like what you see? There’s more.

Get monthly inspiration, blog updates, and creative process notes — handcrafted for fellow creators.

Door-to-Door Shipping & Free Installation: Your International Delivery Playbook

From packaging and insurance to customs, on-site install, calibration, and test washes—here’s how we deliver a ready-to-wash bay anywhere.

Insights

May 2, 2025

Blog Cover Image
Blog Cover Image
Blog Cover Image

What “door-to-door” covers

  • Export packaging & crating: Built for sea/road vibration and moisture.

  • Insurance: All-risk cargo coverage to your site.

  • Customs paperwork: Commercial invoice, packing list, certificate of origin, conformity docs; local requirements handled with our forwarders.

  • Transport mode: Road, Ro-Ro, or sea—balanced for speed/cost.

  • Arrival coordination: Offloading plan, temporary staging, access control.

Your site readiness checklist

  • Foundation & drainage: Correct slope, grates, mud catcher.

  • Utilities: Water flow & pressure, three-phase power, RCD protection.

  • Chemical area: Ventilation, bunds/drip trays, MSDS binder.

  • Safety: Barriers, pedestrian paths, beacons/signage.

Free installation—what’s included

  • Mechanical assembly: Rails, frame, brushes/robotic arms, dryer.

  • Electrical/automation: Panels, sensors, interlocks, emergency stops.

  • Calibration: Spray pressure, chemical dosing, speed profiles, dry times.

  • Test washes: 5–20 vehicles across body types; fine-tuning for your water and chemistry.

  • Training: Daily operation, safety routines, basic maintenance.

Typical timeline (indicative)

  • Build & prep: 2–6 weeks (configuration-dependent)

  • Transit: 5–21 days (route-dependent)

  • Installation & testing: 2–5 days

  • Go-live: Hand-over checklist + acceptance report

After installation

  • Warranty: 6-month coverage on parts & labor for manufacturing defects.

  • Support: Dedicated line, remote assistance, priority spares.

  • Performance review: 30/90-day check to validate throughput, ticket mix, and costs.

CTA: Planning a cross-border project? Talk to our logistics team for a country-specific delivery plan.